An auto-parts plant's rejects jumped in July and its OEE is sliding. Clean the shop-floor logs, calculate reject rate and OEE, and trace the problem to a material supplier, an ageing machine and the night shift.
Sahyadri Auto Components Pvt Ltd · SQL · Python (pandas, seaborn) · solved in your browser
Ready to start?
Create a free account to open the workspace, check your answers and earn a certificate.
Sign up to startThe plant head does not know how far quality and OEE (overall equipment effectiveness) have fallen, which lines and shifts are responsible, or whether the supplier change, the machine condition or the people are the main cause. A data-backed analysis of production from 1 April to 30 September 2026 is needed to decide whether to go back to the old supplier, bring forward the Line 5 overhaul and support the night shift.